Specification support
Early-stage advice on glass build-ups, control strategy and cable routes, with NBS-style budget costs you can carry into a cost plan.
Services
We hold the glass, the film and the electrical drive under one package, so the interfaces between them are ours to resolve.
What we do
Take the whole package or the part you are missing - specification advice, supply only, or installation against units already ordered.
Early-stage advice on glass build-ups, control strategy and cable routes, with NBS-style budget costs you can carry into a cost plan.
Dimensional survey of openings, frames and power positions, returned as setting-out drawings for approval before anything is manufactured.
Directly employed installers glaze units or apply film, fit the drive and control gear we supply and commission the system. Electrical supply and final connections are by others; we advise on what is needed beforehand.
RAMS, insurance, CSCS-carded operatives and site inductions as standard, with O&M manuals and test records issued at handover.
A named contact, warranty administration and reactive support for drive electronics, control interfaces and panel replacement.
Supply-only units and film for glazing contractors and fit-out firms, delivered to programme with schematics and installation guidance.
Process
Each stage closes with something you can issue: a specification, a drawing, a delivery note, a commissioning record.
We review drawings, glazing schedules and control intent, then issue a specification and budget cost.
Site survey confirms opening sizes, frame details, cable routes and power positions before manufacture.
Units or film are produced to the approved schedule, with busbar positions and lead-outs set to suit the design.
Protected delivery to programme, sequenced with the glazing or fit-out contractor as required.
Our installers glaze or apply the film, fit the drive we supply and commission the controls. Electrical supplies and connections are carried out by others.
O&M documentation, warranty registration and a named contact for ongoing maintenance and support.
In use
Smart glass units and retrofit smart film installed into meeting-room and office partitions, switching from clear to frosted at a wall plate, remote or room sensor. Our installers fit the drive and control gear we supply and commission the switching; electrical supplies and final connections are by others.
Working with us
Programmes move, schedules change and rooms get reallocated. We plan for that rather than pricing as though they will not.
Sectors
Next step
Glazing schedules, elevations or a simple room list are enough to begin. Budget costs are typically issued within two working days.